The Storm After the Switch: Qualifying NTN Recovery When the Whole Cell Fails at Once
On a non-terrestrial network, the failure that hurts you is rarely one link going down. It is every terminal in a beam losing its timing reference at the same moment and then trying to get back on together. A feeder link switchover, a gateway handover or a satellite cell switch makes a whole population lose sync in the same instant, and recovery then depends on how the access channel and the core behave when everyone knocks at once. No single-UE conformance run will show you that, because the failure is in the correlation between UEs, not in any one of them.
Why the failure is correlated
In the 3GPP NTN work that began in Release 17, a terminal keeps its uplink aligned by combining its own GNSS position with satellite ephemeris and a common timing advance broadcast in system information. That alignment is only valid for a configured period, ntn-UlSyncValidityDuration, which the network sets in seconds, from 5 s up to 900 s. Every UE in a cell receives the same ephemeris at the same time, so their validity windows tend to expire together, and a gateway or feeder switch that changes the common delay invalidates all of them at once. The result is a synchronised wave of system information reacquisition, random access attempts and RRC re-establishment. The radio can usually absorb one terminal doing this. The real question is whether the random access channel, the scheduler and the AMF can absorb a few thousand doing it within the same backoff window.
The test that exposes it
Build the qualification run around a population emulator driving a large number of UE stacks through a channel emulator that is fed real ephemeris, so that delay and Doppler move along the orbit and are not frozen at a constant value. Load the cell to its planned busy-hour occupancy with live traffic. Then trigger the switchover at the worst moment you can find, which is when most validity timers are close to expiry and the uplink is busy. Instrument everything that sits on the recovery path: preamble collisions per RACH occasion, Msg2 latency, the share of UEs that fall back to idle when they should have re-established, NAS registration rate at the core, and the time each UE takes to get its bearer back. Run the same scenario at three population sizes, keeping everything else fixed. One run at full load only tells you whether the system survived this time. Three runs show you how recovery scales.
Reading the result
The decision rule is about slope, not about any absolute threshold: if the 95th percentile recovery time grows faster than linearly as you double the population, the system has a positive feedback loop, and it will tip over at some load you have not tested yet. Superlinear growth almost always means retries are feeding collisions. A backoff indicator that is too narrow for the beam's population, a re-establishment timer shorter than the long round trip, or a core that rate-limits registrations and so pushes UEs into a second full attach will each produce that curve. As an estimate, a well-tuned GEO beam should keep recovery roughly flat until occupancy gets close to the RACH capacity, and the knee usually appears well before the scheduler saturates. If the curve stays linear, the remaining risk is plain duration. You then compare the recovery time against the outage your service level allows, and the problem becomes a provisioning decision instead of a design defect.
The trade-off left on the table is that stretching backoff and staggering validity durations make the storm smaller but make every individual recovery slower, so the next decision is whether the service you are qualifying can tolerate a longer median outage in exchange for a bounded tail, and that answer has to come from the operator's traffic mix, not from the test bench.
Technical FAQ: Can the switchover storm be qualified with a smaller UE population and then extrapolated?
Only if the small runs already show the scaling shape. Two points can't tell a linear curve from the start of a superlinear one, so you need at least three population sizes, and the largest one has to come close enough to RACH capacity that collisions actually show up. As an estimate, that means at least half the planned busy-hour occupancy of the beam.